Summary of Quiz
$s $s $s $s $s $s $s $s $s $s $s $s $s $s $s $s $s $s $s $s $s $s $s $s $s $s $s $s $s $s $s $s $s in $s in $s in $s in $s in $s in $s in $s in $s in $s in $s in $s in $s in $s in $s in $s in $s in $s in $s in $s in $s in $s in $s in $s in $s in $s in $s in $s
Questions:
Information
You have already completed the quiz before. Therefore, you cannot take it again.
Quiz is loaded...
You must login or register to start the .
You must first complete the following:
Results
Results
$s of $s$s answered correctly
Your time & #160;:
Elapsed time
You have reached$s point(s), ($s)
Point(s) won:$s de$s, ($s)
$s trial(s) pending (possible point(s):$s)
Categories
- Not classified 0%
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
- 31
- 32
- 33
- 34
- 35
- 36
- 37
- 38
- 39
- 40
- 41
- 42
- 43
- 44
- 45
- 46
- 47
- 48
- 49
- 50
- 51
- 52
- 53
- 54
- 55
- 56
- 57
- 58
- 59
- 60
- 61
- 62
- 63
- 64
- 65
- 66
- 67
- 68
- 69
- 70
- 71
- 72
- 73
- 74
- 75
- 76
- 77
- 78
- 79
- 80
- 81
- 82
- Currently
- Review
- Answered
- Exact
- Inexact
-
$s$s of $s
1. Question
1.1 Associate the type of contract with the related term:
a. Cost-plus contractb. Preliminary contractc. Turnkey contractd. Company contract1. Agreement between a general contractor and a client for the execution of the works at a fixed price.2. Contract used when the contractor must build on the land of the client.3. Contract used between a general contractor and a client, who builds on a piece of land that he owns (Itreplaces the purchase offer).4. Contract used by the general contractor who determines the amount that will be paid by the client.ExactInexact -
$s$s of $s
2. Question
1.2 Which elements are parts of a project logbook?
1- The date
2- The profitability of the project
3- The weather conditions
4- The number of ongoing jobsites
5- The name of the visitors on the jobsite
6- Incidents related to safety
7- Comments or events
ExactInexact -
$s$s of $s
3. Question
1.3 How do you protect a site when the works is being executed close to a public way?
1- Install a covered passage;
2- Not deliver the materials on the public way;
3- Install barriers;
4- Always clean the site.
ExactInexact -
$s$s of $s
4. Question
1.4 Referring to the following charts, determine which ones of the subcontractors from Chart 2 could be
hired to execute the works mentioned in Chart 1.ExactInexact -
$s$s of $s
5. Question
1.5 From the information given in the WorkBook, pages 23 and 24, how much will the services of a
carpenter-joiner (journeyman) cost (rounded amount) from the 9 th to the 25 th of October 2019 inclusively.The worker will work 8 hours per day, from Monday to Friday, in a heavy residential building.ExactInexact -
$s$s of $s
6. Question
1.6 Which of the following organisation works alongside with the Quebec construction Code?
1- Environment Quality Act
2- Farm land
3- Building Act
4- Urban planning
ExactInexact -
$s$s of $s
7. Question
1.7 Which of the following elements do you need to take in consideration when preparing a bid for masonry
work?1- The distance to the jobsite;2- The availability of the labor;3- The agreement of the mason's association;4- The seasonExactInexact -
$s$s of $s
8. Question
1.8 A wall measures 25 feet long and you install a stud wall at every 16 inches. How many studs will you need if you plan on doubling the studs at both ends?
ExactInexact -
$s$s of $s
9. Question
1.9 A room measures 9000 mm by 7500 mm. How many 30-centimeter square tiles will it take to cover thesurface of the floor? Make the calculation with a 10% loss in tiles.ExactInexact -
$s$s of $s
10. Question
1.10 From the drawings of the Workbook pages 35 to 41, which is part of the mechanical plans?
ExactInexact -
$s$s of $s
11. Question
1.11 From the drawings of the WorkBook pages 35 to 41, which one shows a cross section of a wall?
ExactInexact -
$s$s of $s
12. Question
1.12 From the drawings of the WorkBook pages 35 to 41, which one shows a layout plan?
ExactInexact -
$s$s of $s
13. Question
1.13 A specialized contractor in glaziery wants to be a subcontractor and put a bid on a construction project.
According to pages 1 to 21 of the WorkBook, determine which section of the specifications WILL NOTbe transmitted by the general contractor in charge of the project?ExactInexact -
$s$s of $s
14. Question
1.14 A call for tenders is used for: (Select only the BEST answer)
ExactInexact -
$s$s of $s
15. Question
1.15 Refer to page 22 of the Workbook to determine the dimension of the door P-2.
ExactInexact -
$s$s of $s
16. Question
1.16 What is the final acceptance of the work?
ExactInexact -
$s$s of $s
17. Question
1.17 With whom do you need to communicate before doing some excavation work?
ExactInexact -
$s$s of $s
18. Question
1.18 Which way do you calculate the insulation?
ExactInexact -
$s$s of $s
19. Question
1.19 What does this symbol mean?
ExactInexact -
$s$s of $s
20. Question
1.20 What does "as built" mean?
ExactInexact -
$s$s of $s
21. Question
1.21 What are the responsibilities of the superintendent?
ExactInexact -
$s$s of $s
22. Question
1.22 What are the consequences of a delay in the work delivery?
ExactInexact -
$s$s of $s
23. Question
1.23 How do you estimate the overall performance of a project?You evaluate:1- The performance of the suppliers2- The performance of the subcontractors3- The profitability of the project4- Weather conditionsExactInexact -
$s$s of $s
24. Question
1.24 What can a contractor do when he finds out one of his subcontractors declared bankruptcy?
1- Inform the RBQ;2- Inform the CCQ to ensure that the workers are paid;3- Inform the CNESST;4- Inform the media.ExactInexact -
$s$s of $s
25. Question
1.25 When a modification must be applied to a bid, the bidder must ...
ExactInexact -
$s$s of $s
26. Question
1.26 When a client wants to pay according to the actual costs of a project, what market are we referring to?
ExactInexact -
$s$s of $s
27. Question
1.27 What is included in the administration expenses?
1- Rent
2- The secretary's income
3- The office insurances
4- Trailer rental
5- Accounting fees
ExactInexact -
$s$s of $s
28. Question
1.28 Which information must be established between the general contractor and the material supplier?
1- The delivery costs2- The delivery delays3- The project schedule4- The validity of the supplier's RBQ licenceExactInexact -
$s$s of $s
29. Question
1.29 What should a general contractor do to ensure the successful development of a project?
ExactInexact -
$s$s of $s
30. Question
1.30 What is the best way to manage materials for a small project of a few days only?
ExactInexact -
$s$s of $s
31. Question
1.31 What does quality insurance mean?
ExactInexact -
$s$s of $s
32. Question
1.32 In your opinion, which of the following statements describes the best jobsite supply management
practice for a contractor?ExactInexact -
$s$s of $s
33. Question
If you get your kitchen redone, you change the kitchen cabinets and the countertop, who shouldn't you deal with?
ExactInexact -
$s$s of $s
34. Question
1.34 You are building a bathroom for disabled people in a building, who do you need to contact?
1- A contractor in interior system
2- A civil engineer
3- A ceramic contractor
4- Structural engineer
5- Plumber
ExactInexact -
$s$s of $s
35. Question
1.35 How do you determine the way to discard the debris?
ExactInexact -
$s$s of $s
36. Question
1.36 How do you get more details related to a specific article of the Quebec construction code?
ExactInexact -
$s$s of $s
37. Question
1.37 Determine, in the right order, what happens to a construction contractor if his client, during the execution of the work, notes the non-compliance of the standards stated by law.
1- Reception of a notice issued by the RBQ or the municipality;2- The contractor must apply corrections;3- The contractor receives a fine if he doesn't comply to the notices;4- In event of a repeat offence, the RBQ can revoke the license of the contractor at fault.ExactInexact -
$s$s of $s
38. Question
1.38 What does quality of the work mean?
1- Work as remarkable as what is seen in Decormag magazine
2- Work done in conformity with the Building Code
3- Work that is completely finished
4- Work that is done according to the client's preferences
5- Work that was done according to plans and in a workmanlike manner
ExactInexact -
$s$s of $s
39. Question
1.39 What does quality of materials mean?
1- Materials paid a reasonable price2- Material that is adequate for the intended purpose3- Category A1 materials4- Materials that were tested5- Materials that respect North America's standardsExactInexact -
$s$s of $s
40. Question
1.40 You completed a 1200 ft² project and you used 9 gallons of paint. One (1) gallon costs 35$. You have a
new project of 5000 ft² of an approximate duration of 225 hours. How much will the project costconsidering that:ExactInexact -
$s$s of $s
41. Question
1.41 Which of the following statements is true, pertaining call for tenders' normal procedures in accordance
with common practices in civil engineering?